* FULL TIME JOBS *
1- INDIGO Contracting General Maintenance & Property Management
STAKEHOLDER May 2017 – Present
2- Al-Suweidi Engineering Consultants Bureau – UAE
Site Engineer/Assistant Resident Engineer ARE March 2014 – Dec 2016
3- Australian Piling Technologies
SITE ENGINEER January 2013 – January 2015
4- Al-Turath Consulting Engineers (University Internship)
TRAINEE ENGINEER June – July 2011 (65 days)
* PART TIME JOBS *
1- Yas Marina Circuit in Al Etihad Grand Prix Formula 1
CASHIER Nov. 2010 & Nov. 2011
2- World Robot Olympiad at ADNEC
ORGANISER Oct. – Nov. 2011
3- ADMM (Abu Dhabi Motor Management) at YAS Marina Circuit (YMC)
OPERATIONS ASSISTANT February – March 2011
4- Abu Dhabi University
Student Recruiter & Admission Assistant (Dec. 2007 – Feb. 2011)
Duties:
• Scheduling School visits.
• Assisting in Student Testing activities. (TOEFL & IELTS)
• Receiving students/families on admission counters.
• Reviewing students’ applications.
• Ensuring that applicants meet university entry requirements.
• Data entry of undergraduate & postgraduate applications and student surveys.
* SELECTED PROJECTS *
1- Yousef Al Hammadi Hotel – Al Musalla, Sharjah/UAE (2018 - present) (on-hold due to COVID-19)
Project consists of G+5 Typical Floors
Solely responsible for all local authorities’ approvals in addition to supervision of sub-contractors’ work.
(Estimated TCC of AED 6.56 Million)
2- Al Jazeera Tower – Corniche, Abu Dhabi/UAE
The Project consists of 3 Basements, Ground Floor, Mezzanine, 33 Typical Floors, Health Club and Mechanical Floor, and Roof. (Estimated TCC of AED 130 Million)
3- Ajyal International School – Al Falah, Abu Dhabi/UAE
The Project consists of Ground Floor, First Floor, Second Floor, Roof and Top Roof. (Estimated TCC of 130 Million)
4- Toyota & Lexus Showroom – Madinat Zayed, Western Region/UAE
The Project consists of Ground Floor, First Floor, and Roof. (Estimated TCC of AED 25 Million)
5- Offices Building, Shops & Stores for Sheikh Saif Mohd. Al Nahyan. – M-9, Mussafah, Abu Dhabi/UAE
The Project consists of GF, First Floor and Roof.
(Estimated TCC of 20 Million)
6- 2 Commercial Buildings consisting of 2 Basement floor G+10 Typical floors – Abu Dhabi/UAE
Implementing Piling works.
7- Many small projects and short-time jobs (such as implementing piling works for the project) including residential villas, construction of workshops, Showrooms, Majlis, additional school building, etc..
التعليم والشهادات العلمية
لا يوجد معلومات حول التعليم والدورات بعد
الكورسات والدورات التدريبية
لا يوجد معلومات حول الكورسات والدورات التدريبية
بعد