Talaat Moustafa Group (TMG), Cairo, Egypt
(www.talaatmostafa.com)
Touristic Projects Manager Jan’10 - present
Projects:
Four seasons Hotel Sharm Elshekh Red Sea , Egypt (contact value $100 million )
Port Pheonice Resort Marsa Allam phase 1 Red Sea , Egypt (contact value $50 million )
New Cairo Capital Construction of Residential zone 3 , 69 buildings , 2096 Apartments (contract value: $70Million)
New Cairo Capital Construction of 2 ministries (contract value: $150Million )
New West Qena city infrastructures & water treatment plant (contract value: $100Million )
Highlights:
Participates in strategic planning activities for specific projects - risk assessment, bid analysis, participation in business plan development, selection of architects etc. Represents contracts department in tenders and evaluation committees
Vetting of tender documents, general conditions of contract, special conditions of contract, drawings etc.
Vetting and Finalization of budgets and bill of quantities
Identification of contractors, sending pre-qualification formats to the identified contractors. After review of PQ finalization of list of contractors for tender floating
Technical guidance to assigned personnel, and ensure proficiency and timeliness of contract administration
Interface and coordinate with Engineers and Subcontractors to ensure synergy at all levels. Accountable for the smooth and efficient management of all daily site operations, ensuring consistent adherence to all health & safety regulations
Implement both short and long-term strategies and project plans to enable the creation of flexible, efficient, and scalable construction operations - prioritize monitoring of construction activities as per design & drawing, and construction materials quality as per the project plan
Assesses the size and scope of the building or site development and creates and implements coordinated programs for site activities and work control systems
Checked and ensured the completeness of any progress payment claims by any consultant and contractor and monitored all contract variations
Ensure works are being executed to required quality, and the staff in general is performing adequately
Liaising with Clients, Designers and H&S representatives as required for individual projects
Keep internal stakeholders informed of commercial activities and progress through collaborative working
Oversee all aspects of management of contractors and establish processes to control the delivery of the work
Provide on-site management and quality control to ensure projects meet time and budget requirements and is built in accordance with the contract documents
Analyze project inception plan and creating a systematic layout in view of key quantifiable parameters encompassing - estimation of takeoff costs, reviewing project constructability, project buy-out, scopes of work, sub-contracting requirements, project profitability and scheduling
Provide updates / adjustments to project plan as necessary to ensure successful completion of the project within the specified budgetary guidelines and quality standards
Undertake a strategic and enterprise level assessment of project volume impacts - not just focusing on the financial impact – but a wider understanding of the operational pressures
Define project objectives and plans, including delineation of scope, budgeting, scheduling, set performance requirements and creating a detailed project planning schedule
Dar-al-Handasah Consultants (Shair and Partners)
www.dargroup.com
Senior Civil Engineer Sep’06 – Jan’10
Project:
New Runway and Automatic Control Tower at Cairo international Airport, Egypt
Duties:
Tender Management & Supervision of the New Runway and Control Tower at Cairo International Airport
Including taxiways connected to the existing runway with a total paved area of about 1,100,000m2. The project also includes service roads, drainage system, infrastructure utilities , concrete works , airfield marking and fencing , electrical works (power supply and no break system , airfield lighting, and control and monitoring system) , new fire station substation (architectural, structural, electrical, plumbing and HVAC works), and Nav. Aids and Meteorological equipment (supply , installation and testing of equipment associated civil electrical works. The main Air Traffic Control Tower is 110 m high with an adjacent 2-storey technical building for navigational and radar system, power plant, HVAC chillers yard, etc. in addition to a control gate and parking area with service roads, landscaping, Infrastructure.
Highlights:
Made sure that any activity offered for his inspection has an approved shop drawing, method statement (MS), Quality Control procedure (QCP) AND Inspection and Test plan (ITP)
Carried out all planned site inspections as per the intervention points marked on the relevant ITP
Site inspection: carried out vide an official inspection and Test Request (ITR), submitted by the Contractor through the proper channels
Inspection status shall be recorded in the ITR and relevant check sheet as per the approved QCP. Verified outstanding items prior to closing the ITR
Verified with independent Testing Laboratory (ITL) that all relevant test resulted related to specific ITR meets the project requirements
Ensured relevant Shop Drawing, Materials used, MS, QCP, and ITP covered all specification requirements - reported any non-conformance in writing to the Construction Manager and the Senior Discipline Engineer
Closely monitored site activities to ensure quality of work in compliance with contract requirements, good construction practice, and shop drawing
Ensured all materials used complied with the approved Material Approval Request (MAR)
Ensured contractor’s personnel used the latest edition of the approved shop drawings, MS, QCP, and ITP as per the project master index
Closely monitored concrete pours and inspected continuously concrete materials delivered to site: ensured compliance with QA/QC procedures, and that all concrete tests were carried out as per contract requirements
United Gulf Construction Company (U.G.C.C), Kuwait
www.ugcc.com
Site Civil Engineer May ’05 – Aug’06
Project:
Responsible for the supervision of site construction works for the following projects in Kuwait ($70,000,000)
Maintenance contract QS/T/111-Al Bakry Street, comprising the replacement of the storm water drainage networks, and the execution of kerbstone works, interlock tiling, concrete edging for tiles
Asphalt deep patches, and asphalt milling and pavement works (type 3 and PMS)
Maintenance contract QS//T/112 – Al Nassim Bridge Road. Construction of a new 4.5 km long
Road linking Al Nassim Bridge and Al Mahraka Road, including grading works, earthworks, concrete edging and asphalt pavement works
Maintenance Contract Qs/T/113 – Abdalli Road Maintenance, comprising the execution of asphalt deep patches, asphalt milling and various asphalt pavement works (type 3 and PMS)
Maintenance contract QS/T/114 – construction of Four Roundabouts in AL Naeem Area
Contract RA/96 (Ministry of public works) – Egaila project Block 2. Execution of storm water drainage main pipeline and gullies, sewerage main pipeline and house connections, water supply pipeline and valve chambers, telephone manholes and hand holes, electrical cable ducts. Earthworks, kerbstone works and various asphalt pavement works
Highlights:
Coordination between trades during the design phase
Reviewed outgoing correspondences to secure against any potential claims during the construction phase
Negotiation claims with the contractor
Responding to contractors correspondences with respect to contractual aspects
Reviewing S curve & cash flow Prepared by the contractor
Supervision the execution of concrete works on site (foundations of the steel structure, foundations of Machines & Underground Tunnels)
Supervision the construction of the high water tank (40 m high) via slip forms
PREVIOUS EXPERIENCE
The Engineering Company for Building and Construction SIAC
Site Civil Engineer May’04 - May’05
Project:
Port Ghaleb project (2Hotels and Residential Buildings of about $30,000,000), Marsa Alam City, Red Sea , Egypt
The Arab Company for Projects and Urban Development, Talaat Moustafa Group, Egypt
www.talaatmoustafa.com
Civil Site Inspector Engineer Jun’03 - May’04
Project:
Site inspector Engineer rehab city residential compound projects- phase 5, Egypt ($20,000,000) Involved in the daily follow- up on all site activities, review of variations and site modifications, review of shop drawings, and ensuring compliance with the approved quality standards
ADDITIONAL INFORMATION
Date of Birth March 6th, 1981
Languages Arabic and English
Current Address Alrehab city, Group 27 Villa 56, Cairo, Egypt
Nationality
Marital Status Egyptian
Married
References Available upon request.